
BAL Assessments across Southwest WA.
Compliant BAL assessment reports for residential and small-scale developments, ready for submission to councils and certifiers.
What is a BAL assessment and when do you need one?
A BAL assessment determines the level of bushfire exposure for a proposed building or property, setting the construction standards required under Australian Standard 3959. The assessment focuses on the proposed building envelope and how it interacts with the surrounding landscape, including vegetation type and proximity, slope of the land, and potential fuel loads. The resulting BAL rating outlines the construction measures needed for compliance and helps property owners understand their bushfire risk and the precautions required to manage it.
In Southwest Western Australia, most residential properties fall within mapped bushfire-prone areas, meaning a BAL assessment is required before council or a building certifier can approve the build. Samphire Environmental prepares BAL reports compliant with State Planning Policy 3.7 and AS 3959, giving you confidence that your documentation is accurate, complete, and ready for submission the first time.
What's included
On-site inspection
Property visit by assessor
Site plan and mapping
Showing vegetation, setbacks, slope and distances
Compliant BAL report
Assessment of vegetation and site features, imagery and BAL determination
BAL Certificate
Assigns the BAL rating that informs construction requirements
Council-ready
Accepted by WA councils and building certifiers
HOW IT WORKS
From first call to lodged report
Get in touch
Send us the address and a basic site description. We confirm scope, send a quote, and book a visit.
Site visit
We conduct a site visit to classify vegetation, determine land slope and measure setback distances. You do not need to be there.
BAL report
We prepare a compliant BAL report and BAL certificate within five business days, written to AS 3959 and referenced to the site observations.
Lodge with confidence
You receive the signed report ready to submit with your planning application or building permit.
BAL Ratings
Understanding BAL rating levels
Your BAL rating determines the construction requirements for your build. Here is what each level means.
BAL-LOW
Low risk
Minimal bushfire risk. No special construction requirements.
BAL-12.5
Low-moderate
Ember attack risk. Basic ember protection measures required.
BAL-19
Moderate
Increased ember and radiant heat exposure. Enhanced protection needed.
BAL-29
High
Significant radiant heat and ember exposure. Considerable fire-resistant construction required.
BAL-40
Very high
Severe exposure. Extensive fire-resistant construction required throughout.
BAL-FZ
Extreme
Flame Zone. Direct flame contact expected. Strictest construction standard.
WHY CHOOSE SAMPHIRE FOR A BAL REPORT
Why choose Samphire for your BAL report
Quoted upfront
We scope the job and send a quote before we start. No surprise line items after the invoice lands.
Accepted by WA councils
Every assessment is written to AS 3959 and WA SPP 3.7, which is the format WA councils and certifiers want to see.
Local knowledge
We live and work in Southwest WA. We understand the landscape and how it shapes your project.
We explain what it means
We walk you through what your BAL rating means for your build and for ongoing property ownership.
SERVICE AREAS
Where we deliver BAL reports
Samphire Environmental covers BAL assessment work across the Capes and Southwest regions. These regions carry extensive bushfire-prone zoning under DFES mapping, and most new residential sites in these zones need a BAL report before local council approval.
Capes region
- Yallingup
- Dunsborough
- Vasse
- Cowaramup
- Margaret River
- Witchcliffe
- Karridale
- Augusta
Southwest region
- Bunbury
- Busselton
- Capel
- Eaton
- Australind
- Harvey
- Collie
- Donnybrook
- Balingup
- Boyup Brook
- Bridgetown
- Greenbushes
- Manjimup
- Pemberton
- Northcliffe
- Nannup
If your site is not listed, send the address through and we will confirm whether it falls inside the service area.
FAQ
BAL assessment questions, answered
A Bushfire Attack Level (BAL) assessment determines the level of bushfire exposure a building will face. It classifies the risk from BAL-LOW through to BAL-FZ (Flame Zone) based on vegetation type, slope, and distance from bushfire-prone vegetation, following Australian Standard AS 3959.
You need a BAL assessment if your property is located within a designated bushfire-prone area under your local planning scheme. In WA, properties within bushfire-prone areas require a BAL Assessment prior to building, development or planning permit approvals.
BAL assessments from Samphire Environmental typically sit within the $500 to $700 range depending on site complexity and travel distance. We send a quote after reviewing your site details.
The site visit runs around one to two hours. We complete your BAL report within three to five business days of the site inspection. Total turnaround from booking to final report depends on scheduling.
A BAL assessment sets the Bushfire Attack Level for a specific building site. A Bushfire Management Plan is a broader document that addresses bushfire risk across a whole development and sets mitigation measures. Some projects need both.
BAL ratings run from BAL-LOW (no special bushfire construction requirements) through BAL-12.5, BAL-19, BAL-29, BAL-40, and BAL-FZ (Flame Zone). BAL-FZ is the highest rating and carries the strictest construction requirements.
Our BAL reports are written to AS 3959 and WA SPP 3.7. Local councils and building certifiers across Southwest Western Australia accept them as part of development and building approvals.
We service the Capes and Southwest regions. Get in touch if you are unsure whether your site is inside our coverage area.
Book a BAL assessment
Ready to book your BAL assessment?
Send us the site details. We come back with a quote as soon as possible.
Get a Free Quote
